Welcome to WMC Insights, your quarterly update on smarter, safer water treatment.
As facilities prepare for colder weather, now is a good time to check whether your glycol systems have the freeze protection they need and review what your water testing results are telling you. In this edition, we share a winter readiness checklist, look at how water treatment fits into preventive maintenance, welcome two new team members, and revisit a cooling tower case that saw results in one week.
Glycol concentration can change over time, particularly if water has been added to the system. Corrosion inhibitors can also become depleted, and the fluid itself can degrade. Testing before temperatures drop gives you time to address issues before the system is under peak winter demand.
Before temperatures drop, take time to:
A few checks now can help protect your equipment and prevent costly winter disruptions.
Schedule a Winter Water Treatment Review >
Scale, corrosion, and biological growth can affect equipment performance long before you see a problem. Reviewing water test results as part of routine maintenance helps your team spot changes early and investigate what’s causing them.
Build these checks into your maintenance plan:
Consistent monitoring can help maintain efficiency, extend equipment life, and reduce avoidable repairs.
Read More About Water Treatment and Preventive Maintenance >
Please join us in welcoming Nicolas Duquette and Peter Gray to WMC Water.
Nicolas brings more than 15 years of water treatment experience to WMC. He’ll work with customers across Quebec to develop treatment programs suited to their equipment, operating conditions, and priorities.
Peter brings more than 35 years of experience in chemical formulation and manufacturing, industrial water treatment, and wastewater treatment. His expertise will support the continued growth of WMC’s industrial water treatment services across Canada.
A Southwestern Ontario facility contacted WMC after finding high bacteria counts and visible algae in its cooling tower. Our review found that the biocide program was insufficient and that a severely plugged injection line was preventing proper dosing.
Our team took four steps to address the issue.
Within one week, the bacteria count fell from a reported 10,000,000 CFU to below 10,000 CFU/mL. The facility also reported a much cleaner tower tray.
If your facility is getting ready for colder weather, WMC can test your glycol, confirm your level of freeze protection, and help you prioritize any corrections before peak heating season.
Contact Our Team to Schedule a System Review >